← All articles

Materials

2 min read

Mass timber comes to the industrial park

Scroll to read

Timber is no longer only for cultural buildings. In offices, rooftop additions and the front of industrial buildings, it is fast, light and low in carbon.

Fig. 01 — Timber rooftop workspace, Canal Works

Fig. 01 — Timber rooftop workspace, Canal Works

01

Story

2 min read

01

Story

Sofia Mendes

Senior Project Architect

Published

Reading

2 min read

Topic

Materials

Mass timber has become the material of choice for libraries, schools and cultural buildings. It is starting to appear somewhere less expected: the industrial park. Not in the racking halls — steel still does that best — but in the parts of industrial buildings where people spend their days.

Where timber works

Office blocks, staff amenities, training centres and rooftop additions are a natural fit. Spans are moderate, loads are predictable, and the warmth of exposed timber changes how people feel about arriving at a distribution centre at six in the morning.

Light enough to build on top

At Canal Works, a timber structure let us add a full storey of workspace on top of a 1920s brick factory without strengthening the existing foundations. A steel or concrete addition of the same size would have meant months of structural work below.

“The lightest structure on site was also the one with the lowest carbon and the shortest programme.”

Fig. 02 — Timber bridges across the atrium, Lakeshore Innovation Centre

Fire, moisture and insurance

The questions we hear most are practical. Encapsulation and charring rates are well understood by code officials; moisture is managed by protecting the timber during construction and measuring it before the building is closed in. Insurers increasingly treat mass timber like any other engineered structure when the details are right.

A hybrid future

We expect the typical industrial building of the next decade to be a hybrid: steel or concrete where loads and spans demand it, timber where people work. Choosing each material for what it does best is not a compromise. It is good architecture.

03

Contact

Start a project

Bring us the
hard brief.

Tell us about the site, the schedule and the constraints. A principal replies within one business day.

03

Contact

Bring us the
hard brief.

Tell us about the site, the schedule and the constraints. A principal replies within one business day.

03

Contact

Start a project

Bring us the
hard brief.

Tell us about the site, the schedule and the constraints. A principal replies within one business day.

(Field notes)

Field notes, four times a year.

Essays, project notes and research from our studios. No noise — unsubscribe anytime.

By subscribing you agree to our privacy policy.

MODULO.

© 2026 MODULO Architecture & Design

Privacy policy

Terms of use

Made in Framer

Create a free website with Framer, the website builder loved by startups, designers and agencies.