The ±3% rule: designing with a live cost model

Scroll to read

Most budgets are checked at the end of each design stage, when change is expensive. We check ours every week — and it changes how design decisions are made.

Fig. 01 — Design review with the cost plan on screen, Montréal studio

Fig. 01 — Design review with the cost plan on screen, Montréal studio

01

Story

2 min read

01

Story

Élise Martin

Managing Principal

Published

Reading

2 min read

Topic

Cost

Ask any client what worries them most about a new building and the answer is rarely the design. It is the moment, months into the project, when the tender comes back over budget. Our answer is not a bigger contingency. It is a cost model that is always up to date.

Quantities from the model

Because the whole team works in one shared model, the quantities of concrete, steel, cladding and glazing are always current. Our cost planners link them to rates every week, so the cost plan reflects the design as it is today — not as it was at the end of the last stage.

Cost as a design input

When the cost of a decision is visible the same day, the conversation changes. Instead of asking whether we can afford a larger canopy at the end of design development, we compare three options in a single meeting and choose the one that earns its place.

“We stopped asking “what will it cost?” at the end. We ask it every Thursday.”

Fig. 02 — Design and cost teams work side by side in one open studio

What ±3% means

Across our last twenty projects, the final account landed on average within three percent of the budget agreed at the end of the Define phase. The number matters less than what produces it: no surprises at tender, fewer redesigns and a client who can plan the rest of the business around a figure they trust.

A live cost model is not a software feature. It is a habit — and like most good habits, it is regular, a little boring and very hard to argue with.

03

Contact

Start a project

Bring us the
hard brief.

Tell us about the site, the schedule and the constraints. A principal replies within one business day.

03

Contact

Bring us the
hard brief.

Tell us about the site, the schedule and the constraints. A principal replies within one business day.

03

Contact

Start a project

Bring us the
hard brief.

Tell us about the site, the schedule and the constraints. A principal replies within one business day.

(Field notes)

Field notes, four times a year.

Essays, project notes and research from our studios. No noise — unsubscribe anytime.

By subscribing you agree to our privacy policy.

MODULO.

© 2026 MODULO Architecture & Design

Privacy policy

Terms of use

Made in Framer

Create a free website with Framer, the website builder loved by startups, designers and agencies.